Minutes, IBIS Quality Committee December 16, 2003 TIME AND PHONE FOR NEXT MEETING December 30, 2003 9-10 AM EST (6-7 AM PST) Phone: 408-902-7868 or 866-902-7868 Meeting access: Meeting ID: 42477825 ROLL CALL Adam Tambone Barry Katz Benjamin P Silva *Bob Ross Brian Arsenault *Eckhard Lenski Eric Brock Gregory R Edlund Hazem Hegazy John Figueroa John Angulo Katja Koller Kevin Fisher *Kim Helliwell Lance Wang *Lynne Green *Mike Labonte Peter LaFlamme *Robert Haller Roy Leventhal Sherif Hammad Todd Westerhoff Tom Dagostino Kazuyoshi Shoji Sadahiro Nonoyama Everyone in attendance marked by * NOTE: "AR" = Action Required. -----------------------MINUTES --------------------------- - Review of minutes for November 18, 2003 Minutes approved with following changed to DesignCon04 IBIS summit Monday Feb 2nd - Announcements EIA Call for Patent Disclosure: No company declared a patent. Next IBIS Summit - Monday Feb 2nd (@ DesignCon04) - AR Review AR Bob H. Replace ?? with "" in multiple places (DONE) AR Bob H. Add ECL models should be swept from -VDD to +2VDD in section 4.X (DONE) AR Mike Labonte to create one line summarizes of each item. Followed by already agreed upon details. (DONE) Minutes and IQ_document.txt have been updated on the web site. - Opens for new items No New Items Thanks to Mike Labonte for significant effort on the IQ_document.txt - Detailed Documentation review Continued Review of entire IQ_DOCUMENT.TXT Started with general overview of Mike's changes. Mike has enumerated all of the sections. Each section has an introduction designated .0 Each item begins with a section number, level, ibis keyword and short one liner, for example; 3.1.1 {LEVEL0} [Package] must have typical values The one liners will be used to cross reference back into checkoff list. Mike reviewed some editorial enhancements Reviewed feedback posted by Tom Dagostino. Sections were reworded based on Toms feedback 4.1.13 and 4.3.11 AR Bob Haller to provide clarification wording to Mike on 4.3.11 Reviewed feedback posted by Kim Helliwell. AR Kim to reword 1.2 to be consistent with 2.1 (IQ summary to be placed in notes section of IBIS file). RemoveD stray parenthetical comments Clarify OF wording in temperature range check. Need to add details around Figure of Merit calculation AR Bob Haller to cut and provide to Mike key pieces of IBIS accuracy Handbook. Bob Ross suggested and team agreed that in general IV and VT data should be referred to as TABLES except when reference to viewing graphical data. When graphical data is implied then terminology of "curves" is acceptable. In some checks it makes sense to review both I-V tables and I-V curves. AR Mike will add wording to section 4.3 to capture distinction between Tables and Curves. Globally replace "curves" with "tables" and only leave in curves where appropriate. I/V will be global replaced with I-V. VT data will always be referred to as V-T tables to be consistent with the IBIS spec. AR Mike will perform query replace. AR Lynne to generate graphics for review to be included in non-text version of IQ document (HTML) Next meeting continue review of IQ_document.txt Next meeting: December 30, 2003 9-10 AM EST (6-7 AM PST) Phone: 408-902-7868 or 866-902-7868 Meeting access: 42477825 Meeting ended at 10:00 AM Eastern Time.